- $200.00 - up to 1 mile, $500.00 - 1-5 miles, $1,000 - over
5 miles
(waterline/sanitary projects, electric lines, communication lines, multiple pole installations, gas main installations multiple address projects.)
Valid 1 year
*PLEASE NOTE*
Permit and Permit fees do NOT include utility connections. A separate Highway Use Permit is required for each individual utility connection. Please see fees (below) for individual connections.
- $100.00 - Single address for utility connections, etc. by bore, open cut,
trenching lines.
Valid 3 months - $75.00 - Utility connections on the same side (shorts) or aerial crossings with no earth movement. Valid 3 months